Search This Blog

Sunday 12 February 2012

Filming evaluation

On the day of filming everything that could have gone wrong, did. we were scheduled to get a lift to our desired shoot location (Pickworth lakes) however, due to unforeseen circumstances, our driver did not show, putting the shoot behind drastically. however despite this we cracked on with what we could do... shooting the conservatory scenes (resulting in smooth and effective footage) overall us being happy with the first day's shoot.

As previously, our driver had not shown, we promptly set another time and date and thankfully this time we got our lift. we arrived at our desired location however ten minuets in, heavy rain set in and we were unfortuanatly forced to return (we attempted to shoot in the rain however could not get desired shots to do fear of damaging equipment)

after two failures we decided to change location to somewhere more local  that we could reach on foot (Bourne woods) there we found an ideal location to shoot as it was remote and unused by the public. however on the day of shooting we had no tripod (stuck in boot of car) and so were forced to shoot free hand. after around four hours of shooting various scenes multiple times we had collected enough footage to create our product.

No comments:

Post a Comment